Inspection of the «Kheirgoo-Khonj» forth Iran gas pipeline
Excerpt 712020
From 24 to 30June 2020 «ZOGPI» completed inspection of 79 km of the 56 inch gas pipeline Kheirgoo to Khonj - IGAT4
F
rom 24June to 30June 2020 «ZOGPI» completed inspection of 79 km of the gas pipeline «Kheirgoo-Khonj» – one of the main gas arteries in forth Iran gas trunkline (IGAT4) , destined for natural gas transport from the Kheirgoo to Khonj (Gas Transmission Operation District 5).
«ZOGPI» succeeded in carrying out the works as planned and successfully executed the whole complex of activities of In-Line Inspection.This operation will be carried out in 5 stages of smart PIG, including; Gaguing, caliper, Magnet, MFL and TFI pigs are performed.